Office Building Experience:

Dollar Loan Center Office Building, Sioux Falls, SD:   Todd was in responsible charge of the mechanical engineering for the new 7000 square foot office building.  The system included a central rooftop VAV air handling unit.  The project was completed in 2007.

McHale Medical Offices, Sioux Falls, SD:   Todd was in responsible charge of the mechanical engineering for the new 16,000 square foot medical office building.  The system included a central VAV air handling unit.  The heat was provided with high efficiency gas fired boilers.  The project was completed in 2007.

Pipestone County EMS Building, Pipestone, MN:   Todd was in responsible charge of the mechanical engineering for a new Emergency Management System Building that included office, training room and vehicle storage.  The mechanical systems included gas fired boilers and DX cooling.  The building was approximately 10,000 square feet and was completed in 2007.

Marshall Public Transit Office, Marshall, MN:   Todd was in responsible charge of the mechanical engineering for a new public transit building.  The building included offices and vehicle storage and covered approximately 12,000 square feet.  The project was completed in 2007.

Yankton County Offices, Yankton, SD*:   Todd was in responsible charge of the mechanical engineering for a new county office building for the city of Yankton.  The building included the various county departments and the county board meeting room.  The building utilized an energy efficient central VAV system with gas fired boilers and perimeter heat.  The building is 3 stories, with approximately 24,000 square feet.

Quail Crest Office/Service Center, Sioux Falls, SD.

Dollar Loan Center Corporate Offices, Sioux Falls, SD.

MetaPayment Office, Sioux Falls, SD

 

Restaurant/Food Service Experience:

Dickey’s BBQ, Marshall, MN:  McInerney Engineering was hired to design the HVAC for this building.  The building is a restaurant and arcade with 4600 square feet.  The system has 35 tons of geothermal heat pumps.  The larger heat pumps have an air side economizer.  The ventilation air is handled by a central air handler served with extended range water to water heat pumps.  This project is currently under construction.

The Banquet, Sioux Falls, SD.

Dining/Kitchen Remodel, Buena Vista University, Storm Lake, IA*.

 

Banking Experience:

US Bank on South Cliff, Sioux Falls, SD.

 

First National Bank, Brandon, SD.

Edgerton Bank Addition, Edgerton, MN.

 

Warehouse Experience:

Graham Tire Warehouse, Sioux Falls, SD

Southwest Sanitation Recycling Warehouse, Marshall, MN

JDS Industries Warehouse, Sioux Falls, SD

Furniture Mart Warehouse, Sioux Falls, SD

Marshall Municipal Utilities Warehouse, Sioux Falls, SD

 

* Denotes project completed while under the employ of another firm.